Yard before the burner.


The trench has been dug and stone laid in it. The wiring and the water tubing is laid in the trench and is buried.


The hole has been dug, stone laid and concrete poured for the wood burner to sit on.


The front pad (were you would stand to load the burner) is poured. Now we wait for the burner to be here on Memorial Day weekend.